There was another Project Meeting at school yesterday. News from that meeting is as follows:

· The area that had Rooms 5-8 is to be grassed. The work to achieve this has started. It needs to be tidied, levelled and have top soil spread on it before sowing.

· The court area behind Room 16 will be replaced with a new court. We hope that this will happen in the next month.

· The concrete pad at the ball wall is to be removed, hopefully over the weekend, and this area will be sown in grass.

· The area in front of the Learning Studio is to be asphalted. Two low walls with seating will be added in to this area.

· The ceiling panels in the hall are to be repaired.

· We still have no decision on the future of the Library to Room 4.

· The relocatable classrooms are now ready for occupation. Room 6 have already moved in to their new classroom.